NORTH ATLANTIC TREATY ORGANIZATION (NATO)

CarryIng out the dIsposal operatIons of dry and lIquId hazardous wastes generated by warshIps belongIng to the member countrIes of the North AtlanTIc Treaty OrganIza tIon (NATO).

InternatIonal Dance No: 519953331

GÜNEY YILDIZI PETROL PRODUCTION DRILLING INC./ BATMAN

usIng the bIoremedIatIon technIque

1: WashIng, aeratIon and removal of chemIcals from the soIl of chemIcal ImpurItIes formed durIng oIl exploratIon well drIllIng In Batman oIl regIon

2:CreatIon of InactIve pool dam, fIlterIng of crude oIl products that cause contamInatIon by spIllIng and splashIng to the envIronment durIng oIl extractIon In the Batman oIl regIon, dIggIng and transportIng the resultIng contamInatIon soIl, transporta tIon, partIal removal of surface oIl and pItch waste a tIer washIng wIth hot water and hydrogen peroxIde, fIlterIng, storage, dIsposal;

restIng and draInIng the remaInIng soIl, then transpor tIng the soIl to the remedatIon fIeld, performIng fIeld sedImentatI on wIth bacterIa, layIng the soIl on the fIeld under nep temperature control and completIng the REDEMATION wITh ven tIlatIon, and comple tIng the fIeld Improvement by movIng It back to the oIl fIelds.



3: CleanIng and dIsposal of contamInatIon pollu tIon of vehIcles, tankers, equIpment In the Batman oIl fIeld area, storage

Project duratıon : 1 year

Project cost: 4.600.000 mIllIon USD

BOTAŞ

BIOREMEDIATION

THE OIL BASED POLLUTION GENERATING FROM THE KIRKÜK – CEYHAN PETROLEUM LINE IN ADANA-CEYHAN REGION HAS BEEN CLEANED. CRUDE OIL WASTE GENERATED IN THE SOIL AND POOLS OF THE FIELD IN CEYHAN REGION WAS PROCESSED ON SITE AND DISPOSAL CONSIDERED BY APPLYING BIOREMEDIATION METHOD.

PhysIcal and chemIcal cleanIng of the contamInatIon that occurs durIng oIl transportaTIon and refInIng In the fIeld, collectIng, fIlterIng, and elImInatIng the contamInated waste

ExcavatIon of the soIls contamInated by the pollutI on caused by the pIpelInes wIthIn the refInery area and In the BOTAŞ responsIbIlITy area due to factors such as puncture and crackIng, transportIng the contamInated soIl to the dIsposal sITe as hazardous waste, pre-cleanIng the IncomIng contamInated soIl wIth pressurIzed hot water centrIfugatIon, and then fIlterIng, fIlterIng and dIsposal of the resultIng wastes, whIch are cleaned by the redematIon method and released to the nature agaIn.

Project duratıon : 2 year

PROJECT COST : $ 15.000.000

Turkish Atomic Energy Authority, Nuclear Waste Management

BIOREMEDIATION

The cleanIng of the contamInatIon caused by the mel tIng of Isotope stIcks from the Nuclear Power Plant, whIch contaIns hIgh raDIa tIon and located at 11 dIfferent poInts wIthIn an area of 84.000 m2 in IzmIr GazIemIr dIstrIct, was carrIed out In cooperatI on wIth TAEK.

RadIoactIve wastes were detected by scannIng an area of 84.000 m2, fIrstly they were sorted through the crushIng-screenIng process, and then they were transferred to the storage area are beIng packaged and armored. applyIng the bIoremedIatIon technIque Heavy metals In the area have been cleaned by reducIng them below the dangerous lImIt In InternatI onal standards. ThIs process was applIed to approxImately 100,000 m3 of waste.

90% of the 84.000 m2 area contaInIng hIgh radIatI on has been cleaned. The amount of radIatIon In the fIeld was Reduced from 10,000 mSv In the fIrst measurements to 60 msv.

DurIng the process, operaTIons such as detectIon studIes In dIfferent areas, scaWerIng on the fIeld, dose detec tIon wIth detectors, crushIng Into materIal In the crusher, dose measurement usIng dIfferent detectors were carrIed out..

Project DuraTIon: 5 years (2014) Project Cost: $10,000,000 (ten mIllIon dollars)

PETKIM Petrochemistry HOLDING A.Ş./ ALIAGA /İZMİR

SolutIon partnershIp of Incineration plant, chemIcal waste, petroleum-derIved waste dIsposal, energy generatIon

KARADENİZ HOLDİNG

In order to collect fuel-oIl wastes orIgInatIng from the power plant opera tIon, to transport and dIspose of fuel-oIl contamInated wastes resultI ng from cleanIng of floors and vehIcles, to prevent soIl pollutIon In case of pollu tIon that may occur agaIn, both waste dIsposal was ensured and pollutI on due to hazardous waste generated In the fIeld was elImInated.

MINISTRY OF FORESTRY AND WATER AFFAIRS OF TURKEY

Hazardous and non-hazardous waste management has been carried out

General Directorate of DSI Waste Management

ContamInated hazardous wastes (dIesel, fuel oIl, waste motor oIl, etc.) were detected at the constructI on sItes In the dam area wIthIn the body of DSI, and they were dIsposed of by categorIzIng the contamInated packagIng and metals.

TCDD (Republic of Turkey State Railways) regional directorate / Alsancak

The management of hazardous and non-hazardous wastes caused by the port operati on In the IzmIr Alsancak regIon, whIch belongs to the State RaIlways, has been ensured. All kInds of hazardous and non-hazardous wastes generated by Cruz and cargo shIps approachIng the port were dIsposed of by transport. In addITIon, spoIled graIns, foods and goods that do not comply wIth the standards, orIgInatIng from export and Import In the port operaTIon, were dIsposed of by our company.



Project DuratIon: 6 Year

AKSA Energy Company

DIsmantlIng of power plants located In the dIsmantlIng zone of Aksa Energy’s power plants In SIIrt, MardIn, Şırnak, Şanlıurfa, owned by Aksa Energy A.Ş. CleanIng the petroleum products contamInatIon formed In the power plant and applyIng bIoremedIatIon to the fIeld DurIng the power plant usage perIod and dIsmantlIng, the petroleum products that spIll Into the envIronment and cause contamIna tIon by splashIng, creatIng a waste pool dam, fIlterIng, physIcal and chemIcal cleanIng of the resul tIng contamInatIon areas, excava tIon of the remaInIng contamInated area and soIl, transportatI on, partIal removal and fIlterIng of surface oIl and pItch waste aqer hot water and hydrogen peroxIde washIng storage dIsposal ;

restIng and draInIng the remaInIng soIl, then transpor tIng the soIl to the redematIon fIeld, performIng fIeld sedImenta tIon wIth bacterIa, layIng the soIl on the fIeld under nep temperature control and completI ng the REDEMATION wIth venTIlaTIon, and completIng the fIeld Improvement by movIng It back to the oIl fIelds.



Removal, storage and dIsposal of asbestos and dust pollutI on formed durIng 2 usage perIods

MeasurIng, packagIng, and storIng of radIoactIve pollu tIon formed durIng 3 usage perIods and sendIng to TAEK

Project DuratIon: 1 years (2017-2018)

PROJECT COST : $ 15.000.000

Ministry of Transport Maritime VS

Waste management has been carrIed out

MEDICAL WASTE OF KAYSERİ MUNICIPALTY

DIsposal of medIcal wastes of health InstItutIons wIthIn the proVInce of KayserI wIthIn the scope of the munIcIpalIty In our SterIlIzatIon system

BERGAMA MUNIPALITY / IZMIR

Disposal of medical wastes of health institutions located in the municipality’s influence area in our Sterilization system

BORNOVA MUNICIPALITY / IZMIR

Chemical, petroleum-derived liquid wastes and waste filters, contaminated ragweed, waste oils, waste oily metals, waste plasti c-derived wastes and metals in the hazardous / non-hazardous waste storage area in the Atatürk Mahallesi area, which is within the Municipality Influence, are separated and transferred to Turanlar A.Ş. Recycling processes were carried out at the recycling facilities of the company.

bioremediation 

Aqer the cleaning of hazardous petroleum-derived wastes, bioremediati on work is carried out in the field where the wastes are located. According to this method, the area is cleaned by changing the environmental conditi ons in order to encourage the growth of microorganisms and reduce the target pollutants.

Project Duration: 1 Project Cost: $ 1,000,000 (one million dollars)

CIGLI MUNICIPALITY / IZMIR

Hazardous wastes such as chemical, petroleum-derived liquid wastes and waste filters, contaminated ragweed, waste oil, waste oily metals, waste plasti c, end-of-life tires are detected and disposed of, including all areas within the area of influence of Çiğli Municipality and the municipality itself. has been done.

Project Duration: 3 years

bıoremedıatıon

AQER THE CLEANING OF HAZARDOUS PETROLEUM-DERIVED WASTES, BIOREMEDIATI ON WORK IS CARRIED OUT IN THE FIELD WHERE THE WASTES ARE LOCATED. ACCORDING TO THIS METHOD, THE AREA IS CLEANED BY CHANGING THE ENVIRONMENTAL CONDİ ONS IN ORDER TO ENCOURAGE THE GROWTH OF MICROORGANISMS AND REDUCE THE TARGET POLLUTANTS.

Project Cost: $2,000,000 (two million dollars)

KARSIYAKA MUNICIPALITY / IZMIR

Hazardous wastes such as chemical, petroleum-derived liquid wastes and waste filters, contaminated ragweed, waste oil, waste oily metals, waste plasti c, end-of-life tires are identi fied and disposed of, including all areas within the impact area of Karşıyaka Municipality and the municipality itself. has been done.

BIOREMEDIATION

AQER THE CLEANING OF HAZARDOUS PETROLEUM-DERIVED WASTES, BIOREMEDIATI ON WORK IS CARRIED OUT IN THE FIELD WHERE THE WASTES ARE LOCATED. ACCORDING TO THIS METHOD, THE AREA IS CLEANED BY CHANGING THE ENVIRONMENTAL CONDİ ONS IN ORDER TO ENCOURAGE THE GROWTH OF MICROORGANISMS AND REDUCE THE TARGET POLLUTANTS.

Project Duration: 1 Year Project Cost: $ 1,000,000 (one million dollars)

WASTE MANAGMENT OF TURKEY SİİRT MUNICIPALITY

CHEMICAL, PETROLEUM-DERIVED LIQUID WASTES AND WASTE FILTERS, CONTAMINATED RAGWEED, WASTE OILS, WASTE OILY METALS, WASTE PLASTI C-DERIVED WASTES AND METALS IN THE HAZARDOUS / NON-HAZARDOUS WASTE STORAGE AREA IN THE ATATURK MAHALLESI AREA, WHICH IS WITHIN THE MUNICIPALITY INFLUENCE, ARE SEPARATED AND TRANSFERRED TO TURANLAR A.Ş. RECYCLING PROCESSES WERE CARRIED OUT AT THE RECYCLING FACILITIES OF THE COMPANY.

BIOREMEDIATION

AQER THE CLEANING OF HAZARDOUS PETROLEUM-DERIVED WASTES, BIOREMEDIATI ON WORK IS CARRIED OUT IN THE FIELD WHERE THE WASTES ARE LOCATED. ACCORDING TO THIS METHOD, THE AREA IS CLEANED BY CHANGING THE ENVIRONMENTAL CONDİ ONS IN ORDER TO ENCOURAGE THE GROWTH OF MICROORGANISMS AND REDUCE THE TARGET POLLUTANTS.

PROJECT DURATION: 1 PROJECT COST: $ 1,000,000 (ONE MILLION DOLLARS)


WASTE MANAGMENT OF TURKEY GAZİANTEP MUNICIPALITY

CHEMICAL, PETROLEUM-DERIVED LIQUID WASTES AND WASTE FILTERS, CONTAMINATED RAGWEED, WASTE OILS, WASTE OILY METALS, WASTE PLAS TIC-DERIVED WASTES AND METALS IN THE HAZARDOUS / NON-HAZARDOUS WASTE STORAGE AREA IN THE ATATURK MAHALLESI AREA, WHICH IS WITHIN THE MUNICIPALITY INFLUENCE, ARE SEPARATED AND TRANSFERRED TO TURANLAR A.Ş. RECYCLING PROCESSES WERE CARRIED OUT AT THE RECYCLING FACILI TIES OF THE COMPANY.

BIOREMEDIATION

AQER THE CLEANING OF HAZARDOUS PETROLEUM-DERIVED WASTES, BIOREMEDIATI ON WORK IS CARRIED OUT IN THE FIELD WHERE THE WASTES ARE LOCATED. ACCORDING TO THIS METHOD, THE AREA IS CLEANED BY CHANGING THE ENVIRONMENTAL CONDITI ONS IN ORDER TO ENCOURAGE THE GROWTH OF MICROORGANISMS AND REDUCE THE TARGET POLLUTANTS.

PROJECT DURATION: 1 PROJECT COST: $ 2,000,000 (ONE MILLION DOLLARS)


İzmir General Directorate of Water and Sewage(İZSU)

Petroleum-based wastes (dIesel, fuel oIl, waste motor oIl, etc.) orIgInatI ng from machInery supply and waste water facIlItIes formed wIthIn the body of IzmIr Water and Sewerage General DIrectorate (IZSU) were Iden tIfIed, and contamInated packagIng and metals were categorIzed at 80 dIfferent poInts, and sober management was carrIed out.

IZBETON COMPANY by METROPOLITAN municipality of İZMİR

WIth sImIlar methods, the management of hazardous wastes generated as a result of the company’s

workIng area was carrIed out In the IzmIr MetropolItan MunIcIpalIty İZBETON company. Project DuratI on: 2 Year

IDC (IZMIR DEMIR CELIK) PORT MANAGEMENT

Hazardous and non-hazardous waste management has been carried out

EGE GUBRE PORT MANAGEMENT / ALIAGA/IZMIR

Hazardous and non-hazardous waste management has been carried out

DIYARBAKIR METROPOLITAN MUNICIPALITY

Petroleum-based wastes (diesel, fuel oil, waste motor oil, etc.) originating from the machinery supply and waste water facilities within the body of DISKI (Diyarbakır General Directorate of Water Works), including 12 district municipalities and the metropolitan municipality itself, which are within the scope of the Metropolitan Municipality, are determined. disposed of by categorizing contaminated packaging and metals.

On the other hand, in the supply areas, soil contamination has been made superficially and its improvement has been achieved.

Project Duration: 1 Year

PROJECT COST: $ 500,000

MINISTRY OF TRANSPORTATION and COMMUNICATION – TURKEY

Waste management has been carried out

TR MINISTRY OF HEALTH PUBLIC HOSPITALS ASSOCIATION

ARCHIVE CLEANING OF HOSPITALS OF TURKISH GOVERNMENT MINISTRY, archieve scannIng,PATIENT STORED IN ARCHIVES BACK OF X-RAY FILMS IN THEIR FILES ENSURING THE TRANSFORMATION

TPAO-BATMAN

bioremediation technIque


ContamInated soIl, sand, gravel, metal and packagIng wastes from oIl drIllIng wells belongIng to TurkIsh Petroleum CorporatIon were taken from the regIon by lIcensed vehIcles and dIsposed of by expert teams of dIsposal facIlItIes.

.creatIon of InactIve pool dam, filtering, excavation of the resulting contamination soil, transportation, partial removal of surface oil and pitch waste aQer washing with hot water and hydrogen peroxide, filtering, storage, disposal of crude oil products that spill into the environment and cause contamination by splashing;

restIng and draInIng the remaInIng soIl, then transportIng the soIl to the redemation field, performing field sedimentation with bacteria, laying the soil on the field under nep temperature control and completing the REDEMATİON with ventilation, and completing the field improvement by moving it back to the oil 

FIELDS BIoremedIaTIon technIque was applIed to the fIeld.

Project DuratIon: 2 years (2012 -2014)

Project Cost: $17,000,000 (seventeen mIllIon dollars)

TCDD (Republic Of Turkey State Railways)

The OPERable and non-operable wastes that may be caused by the IzmIr Alsancak operatIon, whIch belongs to the State RaIlways, are durable. All kInds of Improbable and sketch wastes of Cru and cargo shIps berthing In the port have been restored by transportIng them. In addItIon to thIs, It has been rAIsed about the goods comIng from our country and the goods from the past, from the export quotatIons In the port operation.

CompostIng method (rotting)

ThermophIlIc travelers (40-65°C) Is the process of decomposIng organIc wastes by mIcroorganIsms. This has been exposed to soIls and bIosolIds contamInated wIth petroleum hydro, methods, chlorphenols, pesTIcIdes, herbIcIdes and nitro aromatics, PAH and nItro aromatIcs

Izmir Metropolitan Municipality

Hazardous and non-hazardous waste management has been carrIed out

KUTLUSAN

Hazardous and non-hazardous waste management has been carried out